arrow top
E-mail: office@dzervin.eu
|
Phone: +381(0)19.731120

Drying Room Facility

The drying fruit facility occupies an area of 600m 2. This technological line consists of two drying rooms with the capacity of 9t / 24h of fresh plums per room. A line for the finalization of the prunes processing, containing 15 double destoning machines for manual operation has been installed with the capacity of 4t / 24h.

pogon susare 1
pogon susare 2
pogon susare 3
pogon susare 4
pogon susare 5
pogon susare 6
pogon susare 1
pogon susare 2
pogon susare 3
pogon susare 4
pogon susare 5
pogon susare 6